06-24-2019, 10:31 AM
(06-23-2019, 10:14 PM)BrokenOlMarine Wrote: In the pic, it was, but the jack was still under the front edge of the building. Once the jack was pulled, there was a half bubble down angle toward the ramp. That, plus the gap between the lip and the beginning of the ramp, should help with drainage. In addition, I plan to add three or four pvc lined 1/2" drain holes if water still stands on the lip outside the closed roll up door.
Steve
Missouri
The Revos apparently are designed to clamp railroad ties and pull together horrifically prepared joints
WaterlooMark 02/9/2020
Missouri
The Revos apparently are designed to clamp railroad ties and pull together horrifically prepared joints
WaterlooMark 02/9/2020